AI-powered permit expediting

Get approvals faster.

Heytor expedites permits for multifamily and large residential projects. AI reads the zoning, the code and your drawings. Our local team takes it through every department, board and reviewer.

Get a 24-hour site report Book a call
heytor › reading zoning · 3 approvals · est. 14–18 weeks
Line drawing of a multistory building under construction with a tower crane
HEIGHT · 10 FL · PASS
EGRESS · L3 · FLAG
SETBACK · PASS
CRANE · ROW PERMIT

PLAN CHECK · SAMPLE PROJECT · 24 UNITS

Zoning: height and FARPASS
Egress separation, level 3FLAG
Energy code documentsMISSING
Cover sheet and stampsPASS

Site reports in 1 business day

Fixed fee per project

Local team at every hearing

Now in Cambridge and Somerville, MA

The problem

Permitting can take longer than building.

On a multifamily project, the schedule risk is rarely the concrete. It's the months between design and a stamped permit, and every surprise along the way.

Every round costs weeks

Each round of reviewer comments sends drawings back to the design team and restarts the clock.

You can't just walk in

Submissions are online now. Each question to a reviewer waits in a queue, so the package has to be right the first time.

Every city plays differently

Zoning, historical review, boards and department sequence change from one city line to the next.

Surprises after closing

The relief you need or the review you missed often shows up after you've already bought the site.

Heytor site report

Know the permit path before you sign.

Send an address and a rough scope. Within one business day you get a clear report, built by AI and checked by our local team, that you can share with partners, lenders and your architect.

  • Zoning district and overlays
  • Height, FAR, setbacks, unit count
  • As-of-right or relief needed
  • Boards and reviews in sequence
  • Timeline range and permit fees
  • Risks and recommended next steps
Order a site report

Sample site

Site report

District

Residential

Max height

45 ft

Path

Special permit

Timeline

16–24 weeks

Approval path mappedReport ready
1Historical commission review
2Zoning board hearing
3Building permit and plan review
4Utilities and curb cut sign-offs

Sample report. Values for illustration only.

Platform and AI

Every permit, every comment, one place.

Your whole team works from the same live record: owner, architect, engineers and lender. No more chasing status by email.

AI plan review

Upload each drawing set. Heytor checks it before the city does and sends clear flags to the design team.

  • Zoning conformance
  • Egress and fire separation
  • Accessibility requirements
  • Energy code documents
  • Cover sheet, address, stamps
  • Consistency across sheets

Checklists and filing

The exact applications, forms and documents each department needs, in the right order, filed by our team.

  • Permit-by-permit checklists
  • Forms prepared for review
  • Submissions tracked by date
  • Fees and receipts in one place

Live status and comments

See where every permit stands and work through reviewer comments together, with responses drafted for your consultants to confirm.

  • Status across departments
  • Comment-response workflow
  • Deadlines and hearing dates
  • Shared with your whole team

Local expediting team

Software gets you ready. People get you approved.

AI can read the code. It can't sit in a zoning board hearing or know which reviewer wants what. Our team does that part.

Filing and follow-up

We submit, track and follow up with each department so nothing sits in a queue.

Boards and hearings

Zoning boards, planning boards and historical commissions, prepared and attended with you.

Reviewer comments

We coordinate responses across your architect and engineers and resubmit fast.

Through to occupancy

Utilities, curb cuts, inspections and sign-offs until the certificate of occupancy.

How it works

From address to approval.

  1. 01

    Site report

    Zoning, approvals path, timeline and risks in one business day.

  2. 02

    Design check

    AI reviews each drawing set and flags issues while they're cheap to fix.

  3. 03

    Package and file

    Our team assembles complete applications and submits them.

  4. 04

    Comments and hearings

    Responses, resubmissions and board hearings, handled.

  5. 05

    Permit issued

    Then inspections and sign-offs through occupancy.

Who it's for

Built for larger residential projects.

Developers and owners

Underwrite with a real permit timeline and keep projects on schedule.

Architects

Get your hours back for design, with fewer rounds of comments.

Builders

Know your start date and avoid crews waiting on paper.

Lenders and partners

See permit status and risk without chasing anyone.

Pricing

A fixed fee. No hourly surprises.

You know the cost before we start, so permitting is a line item, not a risk.

Site report

Contact us

Per address. Delivered in one business day. Credited toward full expediting if you go ahead.

Order a report

Full expediting

Custom quote

Fixed fee per project, set by scope and jurisdiction. Plan review, filing, comments, hearings and tracking through occupancy.

Book a call

How we got here

Built inside a development company, not a lab.

Learned on real projects

Heytor started inside a Greater Boston development company building multifamily and residential projects in Cambridge and Somerville. On every project we went through the same cycle: zoning relief, historical reviews, accessibility variances, and plan comments that showed up months into review. Most delays weren't bad luck. They were issues sitting in the drawings that nobody caught until a city reviewer did.

AI plus local knowledge

So we built what we wanted for ourselves. AI that knows the zoning and the code, reads the plan set, and flags problems while they're still cheap to fix. And a local team that knows the departments, the boards and the reviewers, and takes it the rest of the way. Our goal is simple: fewer review cycles, predictable timelines, and more housing built sooner.

Founded by former Google and Amazon employees Now working in Cambridge and Somerville, MA

Questions

Do you replace my architect?

No. Your architect designs and stamps the drawings. We check them, handle the permitting work and coordinate comments with them.

Where do you work?

Cambridge and Somerville today, with more Greater Boston cities next. Ask us about your site.

What size projects?

Any size. Our focus is multifamily, larger residential and mixed-use with residential, but we take projects big and small.

How accurate is the AI?

Every report and every flag is checked by our team before it reaches you. AI does the reading; people make the call.

Can you guarantee a timeline?

No one controls the city's review. We give you a realistic range up front, flag risks early and keep you updated if anything moves.

Skip permit delays.

Send us your site. We'll come back with the permit path and what we'd flag.